GOLEMArchitecture·Art·Design

04.b.1Which activities need their own room in a public arts venue?

An activity needs its own room when it depends on conditions the rest of the venue cannot share during normal opening. Draw two activities that must run at the same time and write down what has to be controlled on each side. If the clash occurs once a month, see whether scheduling can resolve it. If it recurs each afternoon, price an enclosure designed for that use. A reading group and a drawing class could share a well-lit room at different times. A recurring activity that needs extraction requires its own technical assessment, regardless of its place in the calendar.

Work from the clashes that actually occur

Put a reading area beside an amplified talk on a sample timetable. During the sound check, listen in the reading area with the event door open for arrivals and again during the talk. A sound-absorbing lining can reduce reverberation in the room. Ask the consultant to trace the separate paths sound may take into the neighbouring space, through the door or around the partition via the ceiling or ducts. The Institute of Acoustics and Association of Noise Consultants distinguish direct and flanking sound paths in their design guidance for schools. Ask the acoustic consultant to define what the listener should hear at each position, then use the expected audience to test the assumption. Research by Dario D’Orazio and colleagues treats visitor numbers and talker-listener distance as variables in modelling acoustic comfort in busy museums. Cemre Orhan and Semiha Yilmazer studied how people perceived sound in different museum environments. Test both occupied rooms under the uses you are planning. Institute of Acoustics and Association of Noise Consultants, Acoustics of Schools, 2015 D’Orazio, Montoschi and Garai, 2020 Orhan and Yilmazer, 2021

For a workshop, put the processes involving dust, fumes or heat on the equipment plan. Ask the workshop specialist and building services team which can run together, which need a separate control or enclosure and who can supervise them. Great Britain’s Health and Safety Executive publishes separate ceramics guidance for processes such as dry fettling and spraying glazes. Use the applicable local requirements and a process-specific assessment to brief controls. HSE, Ceramics silica guidance

At Diriyah Public Programs, Ariel André and GOLEM designed separate specialist rooms off a common foyer. The project description records a print room with wet and dry areas and a separate youth studio. The separate rooms give the operator a choice about what to show from the foyer and what to keep within a class. On a new plan, draw what the tutor can see from the demonstration table and what a person in the foyer can see when the door is closed. A class considering work on a light-sensitive process will also need the lighting and glazing reviewed for that task. ArchDaily, published Diriyah plan and project description Planning a ceramics or printmaking workshop

The work taking place in a room can determine which activities need their own door. Sesc’s account of the Pompeia creativity workshops explains how making informed a factory conversion. At Diriyah the architects’ description lists kilns, extraction and modular collage tables for the workshop, and wet and dry areas for screen printing, risography and photography. A new brief can put the proposed tools, materials and visitors in one occupied drawing before it fixes the room schedule. An equipment list can then identify who will operate and look after each service. The operator can apply it in detail when briefing a ceramics or printmaking workshop. Sesc São Paulo, Como foram pensadas as Oficinas de Criatividade do Sesc Pompeia ArchDaily, Diriyah Biennale Foundation Public Programs Building