A foundation should commission a brief that ties a sample month of public activity to a site plan and an operating budget. Include a hot-weather arrival and a busy evening. List the equipment each room needs and the opening hours the duty team can cover. Ask the programme director to own the calendar and the facilities team to price staff and running costs for each scenario. If there are two sites under consideration, give the same programme to both and record what each site changes in the budget.
Draw the site in the hours people will use it
People arriving by public transport, drop-off or car parking may reach the venue from different directions. Select a typical afternoon and an evening event. Show where a school group can wait in shade and which entrances and toilets it can use. A 2024 simulation study of schools in Riyadh examined shade and planting around school arrival and dismissal. A study of outdoor thermal comfort in Doha’s Souq Waqif tested local interventions using a microclimate model checked against field measurements. Mark the hours of shade on the queue or waiting area using the proposed venue’s orientation and intended opening hours. For a site served by public transport, identify the actual stops and draw the door-to-stop route people will use. Qatar National Library names its tram and metro stops and explains how they connect to parking. Riyadh school study, 2024 Souq Waqif study, Hamad Bin Khalifa University Qatar National Library, Hours and Location
At Diriyah Public Programs, Ariel André and GOLEM incorporated outdoor benches and a café awning near the building. At Doha’s Fire Station, the ground-floor Garage Gallery hosts the annual artists-in-residence exhibition. Its Education Studio hosts hands-on workshops. Agree which activities will be open to the public and what the resident or visiting artists need to prepare their work. Use the brief to decide where waiting, outdoor teaching and informal visits are expected to happen, and who opens and looks after those spaces. If an outdoor class would have to move indoors at certain times of year, include that second layout in the room schedule. Fire Station, Garage Gallery Fire Station, Public Programmes
Give local consultants a defined first task
A short note from the local architect and engineers can identify the approvals and servicing work that will affect the concept price. Include the intended uses, the existing occupancy where known, event capacities, extraction and fit-out work. Saudi Arabia publishes its Building Code through the national committee. In Qatar, the General Directorate of Civil Defence publishes technical requirements including assembly-occupancy guidance. The appointed team should establish applicable editions and requirements for the actual premises. Before fixing materials and equipment, ask the facilities team where it can obtain spare parts and who can service the machines. List equipment, initial costs and recurring costs in the same brief. Agree Arabic and English room names with the communications team so the site drawings, signs and booking information use the same names. Saudi Building Code, 2024 code catalogue Qatar Civil Defence Technical Requirements Guide
For a feasibility discussion with Ariel André and GOLEM, bring one candidate site and the part of the programme that has the greatest effect on its hours or services. Commissioning the architect