The second use of an adaptable building is a useful test of the first. When a client can name two likely uses, the architect can draw both over the same structure and services grid. The date, staffing, and time the building can close for the change help establish which parts actually make both uses possible.
Select against a specific change, with the interfaces visible
For FRAC Nord-Pas de Calais, Lacaton & Vassal’s account describes retaining the original AP2 hall alongside a new building and giving the hall a separate operating capacity. That is a useful question for a client looking at a large existing shell. The client can decide which rooms need fully fitted services now and what can remain available for larger or changing uses. For a much smaller intervention, GOLEM’s removable wall in SUPERZOOM brings the discussion to one opening. A candidate can show the two resulting layouts and what is needed to change between them. Lacaton & Vassal, FRAC Nord-Pas de Calais
ISO 20887 sets out the scope of design for disassembly and adaptability. USGBC’s interiors guidance discusses future scenarios and retaining useful interior elements. Estimate and trial the changeover with your own staff, services, and room inventory. The architect and engineers can identify the service zones, supports, access panels, and equipment that have to remain available in both states. The client can place the design assumptions and acceptance checks in the appointment. A partition with a clear opening on plan still needs somewhere to go and somebody able to move it. ISO 20887:2020, Design for Disassembly and Adaptability U.S. Green Building Council, Interiors Life Cycle Impact Reduction Guide
Price a specific future change
DETAIL describes sliding partitions used to create temporary studios in a converted building in Kassel. The client can compare your own scenarios at the scale of the closed room and the open area. A dividing line on the plan needs enough floor or wall to park the elements and a way to turn and return them. The proposed team should be able to explain whether the architect is including track access, services in both configurations, and the effect of a change on the neighboring room. If the client expects an acoustic or environmental result, name a consultant and the test, including the room conditions when they will measure it. DETAIL, Kunstraum Kassel, Innauer Matt Architekten
The client can give each candidate a worksheet with an ordinary operating week and a later state that uses the same shell differently. The client can have them show the initial work, likely later work, and which parts are accessible between. The proposed team should be able to explain whether that later scenario depends on further permissions, a closure or work by a separate trades team. Price the later use in its own column.
The client can describe one timed acceptance trial in the brief. The client can choose the people the building will usually have on shift and the room operations that must continue. Mark where unused items are parked and where shared services can be reached during the change. The architect can give the operator a copy of the two accepted setups, the crew to expect, and the person who records when the room is ready. If a later conversion takes building work, identify which specialist can inspect what stays and how much capacity is left for other programming during the closure.
Project types
How to choose an architect for an adaptable building or phased addition?
A candidate can present two plausible plans on the same measured survey and a third showing any construction phase. The client can compare structure, risers, leases, and service interruptions before paying for adaptability you may never use. Bring the site and program for a first scope review with Ariel André, GOLEM.
How to choose an architect for a building with divisible rooms and shared services?
The architect can show a plan of occupied rooms on both sides of the proposed wall. Coordinate approaches, ceiling support, and services, and ask specialists how separation and the combined state will be checked. For an initial design assessment, speak with Ariel André, GOLEM.
How to choose an architect for a building that uses site-specific modular furniture?
The architect can compare actual wall and floor tolerances with the dimensions that need to repeat. The client can review one furnished room drawing with the manufacturer before tendering the surrounding finishes. Review that brief and the local team required with Ariel André, GOLEM.
How to choose an architect for a venue that reconfigures rooms while in use?
A candidate can present an operating plan that shows the public route and staff movement at the same time. The client can check who can stop the work if a required route is occupied and who accepts the tested alternative. Take the site and the decision you need to make to Ariel André, GOLEM.
How to choose an architect for a building fit-out planned for repair, reuse, and expansion?
The architect can present a brief that separates what the building can retain from the modules likely to travel or be replaced. The client can check how the scope deals with known reused parts, matching later additions, and records for the next team. For a feasibility conversation, start with Ariel André, GOLEM.
How to choose an architect for a commission combining buildings and modular furniture?
The architect can name design ownership on both sides of a building-to-furniture connection. The client can compare priced layouts, the person who witnesses tests, and the operating assumptions behind lifetime costs. The first study can use the relationship between Diriyah’s workshop furniture and building services to frame the same responsibility question for your commission. Review the furnished scenarios and building-service interfaces with Ariel André, GOLEM.