A client commissioning an adaptable interior and its furniture can choose a lead practice that draws the two together. A built example can show what the practice designed and what local consultants, engineers, and makers developed. Ariel André and GOLEM can lead both parts in one commission. The brief should say who will develop the local technical and construction information and who can approve a change when a building service or furniture part needs to move.
Start with the plan where the furniture is in use
The Diriyah Biennale Foundation commissioned Ariel André and GOLEM to give its year-round Public Programs a permanent home in a former warehouse in JAX District. Bricklab had previously adapted the building as a multipurpose hall. GOLEM's project brought a café, library and lounge together in a foyer and gave workshops and the print room dedicated spaces. The published plan and workshop description place modular collage tables in a project that also had to accommodate ceramic and glass kilns and extraction hoods. A drawing showing only the tables would leave most of the commission unexplained. The client needed to see the equipment, furniture and rooms the public would move through. Diriyah Biennale Foundation Public Programs Building, ArchDaily project description and plan, 2026 Serag Heiba, SceneHome, 2026
For a new workshop commission, ask the designer for two furnished plans of the same room. In one, people work in small groups around tables. In the other, the room has to take a demonstration with an occupied aisle and somewhere to set down finished work. Ask where a cart carrying the work can pass when chairs are pulled back. Then put a section through the table edge and the fixture or equipment it depends on. This makes it easier to interview a practice about the commission itself. Its drawings should let the operator point to the part that has to change when a different group books the room.
A portfolio can also show where the joint commission benefits from independent specialists. At DIVE in London, GOLEM designed the quarter-circle lounge tables. The bar and lounge also have an acoustic threshold developed by sound specialist Basil Martion. Wallpaper describes both at the scale of the guest's route and seat. In an appointment interview, use that difference to ask which decisions the interior and furniture team can make together and which require another consultant. An acoustic threshold has its own design questions even if the same practice coordinates it on the plan with the lighting and the table layout. Wallpaper, DIVE in Marylebone
Write the specialist work into the appointment
Vitsœ’s headquarters in Royal Leamington Spa offers a different commission structure. Vitsœ and Martin Francis are credited with building concept and design. Waugh Thistleton was the delivery architect, and Eckersley O’Callaghan designed the timber frame through detailed design. The engineer describes the relationship between the adaptable timber building system and Vitsœ’s 606 shelving. The analogy crossed scales, while structural design had a named specialist. Ask a prospective practice how it would keep a manufacturer's prototype, a furniture drawing and the engineer’s criteria in step. One team can bring the work together while several parties produce the information needed to build it. Eckersley O’Callaghan, Vitsœ Headquarters and Production Building, project credits OnOffice, Vitsœ headquarters, 2017
The RIBA Plan of Work identifies a Responsibility Matrix as a way to name who designs each part of the work. Use that principle in the appointment. State who leads the interiors and furniture, who delivers the local statutory and technical work, and who checks the fabrication information. Include the operator’s review of a sample furniture assembly and of the room as it will be occupied. Ask who prepares the next drawing if a prototype needs a heavier base or an extra clearance. A fee should identify whether the further coordination visit or prototype review is included, so the client can compare two teams against the same work. RIBA Plan of Work 2020 Overview, Responsibility Matrix and Technical Design
Choose one undecided connection as part of the interview. If a worktable needs power in two layouts, ask where the local engineer’s drawing ends and what the furniture maker will show of the cable route. Establish which parts of the sample the designers will review together. The client can then compare the proposed fee against the work of resolving that connection before it reaches the contractor.
A client discussing the job with GOLEM can share a surveyed plan, two activities the room needs to accommodate, and the names of consultants already appointed. Ask for a proposal showing the first coordinated drawings, the proposed prototypes, and the responsibilities that still need to be assigned. The client can use that scope to appoint the design lead and the remaining collaborators against the same brief.