09.a.1How do you design a building that can accommodate different uses over time?

An owner planning for a future use can compare it with the opening program on two copies of the same measured plan. Both drawings should show the structure, entrances, and main service routes. Once the team has marked the work needed to change uses and any rooms it would have to close, the owner can decide what to build at opening and what to leave for a later project.

Give the building a plan for the second use

A cultural foundation with a reading room and a classroom might eventually need a second teaching space. The plan can show where the second group arrives and how it reaches the room while the first group is working. Books, occupied tables, and equipment belong on that drawing. A bay that looks clear when empty may contain the only place to turn at the door once chairs are pulled out. The people who will use the rooms can check both layouts, including how someone would approach a table in a wheelchair. A section where the added wall meets a window or crosses a duct gives the team an early indication of how much work the second room would take.

Robert Schmidt III and his coauthors distinguish a “change of space” from a “change of function” in their study of building adaptability. Their diagram also gives furniture adjustments a separate place. An owner can use these distinctions to brief a project at different intervals. Rearranging a reading room for a weekly class can be a job for venue staff. Turning part of the building into a permanent production workshop calls for checking the room against the equipment and the way it will be used. Give the two changes their own lines in the brief, with the person who can authorize each one. Robert Schmidt III, Toru Eguchi, Simon Austin, and Alistair Gibb, What Is the Meaning of Adaptability in the Building Industry?, 2010, figure 3

A shared foyer and rooms with dedicated services

At the Diriyah Biennale Foundation’s Public Programs Building in Saudi Arabia, Ariel André and GOLEM worked with the Foundation’s Public Programs team in a former wood-storage warehouse that Bricklab had already converted into a multipurpose hall. The published plan shows an open center with enclosed rooms along its edges. The project account identifies the shared foyer as the location of the café, library, and lounge. The print room has wet and dry areas and a separate darkroom. A program can change in the foyer while specialist equipment stays in rooms built around it. Trace the path from the entrance to those rooms on the plan. It gives a commissioning team a starting point for deciding which parts of a new venue can share space and which need their own services. ArchDaily, Diriyah Biennale Foundation Public Programs Building, 2026, project record and floor plan

The foundation’s program listings put Culture on Tap in the B7 foyer and a four-day Risograph course in the print workshop. The latter includes preparing images, printing color layers, and assembling a finished edition. When briefing that kind of room, give a class a place to leave sheets between operations and draw the path back to the shared foyer. The printed program identifies the rooms and activities. Use the plan to decide what can stay set up between one booking and the next. Diriyah Biennale Foundation, Public Programs calendar, October 2026 Diriyah Biennale Foundation, Risograph 101 masterclass, 2026

In an interview with Serag Heiba, André describes plasterboard partitions that can be “cut, pierced, patched, moved and rebuilt.” For a client asking for comparable adaptability, specify how the wall can be rebuilt around the services. Draw which face a contractor can open and where a revised wall can meet the ceiling. If the new line runs across an access panel, move the panel now or put that work in the allowance for the later alteration. Locate the shutoff and show on the plan which other rooms it serves. A change confined to one room on the floor plan may require shutting down its neighbor. Serag Heiba, SceneHome interview with Ariel André, September 2026

Where the existing building can take an addition

At Grand Parc in Bordeaux, Lacaton & Vassal, Frédéric Druot, and Christophe Hutin transformed 530 dwellings while retaining their residential use. The EUmies Awards dossier shows a freestanding precast structure along existing façades. Its 3.8-meter-deep extensions added winter gardens and balconies, with sliding glazed doors between the dwellings and the new space. Oliver Wainwright’s account in L’Architecture d’Aujourd’hui and the before-and-after drawings show how much of the intervention was concentrated at the building edge. An owner considering an addition can use a similar section to mark the existing structure, the new support, and the openings that connect them. Show where the new foundations would sit and how much of the entrance approach the contractor would need for the work. EUmies Awards, Grand Parc Bordeaux, project dossier and sections Oliver Wainwright, L’Architecture d’Aujourd’hui, issue 412, 2016, pp. 54 to 57

Put a cost and a closure on the drawing

One of the European Commission’s Level(s) assessment options for office buildings tests designs against future adaptation scenarios. Its checklist considers access to service ducts and the effect of structure on service routing. In a public building, use the same drawing exercise as a briefing tool. Make a schedule beside the plans showing what staff can rearrange, which work needs a contractor, and which room or route is affected during the work. Have the local design team identify which changes need a new review of occupancy, exits, or access. Price the provisions for the more likely change separately, so the owner can decide whether to buy them with the first project. Nicholas Dodd, Shane Donatello, and Mauro Cordella, European Commission Joint Research Centre, Level(s) indicator 2.3, 2020

An owner discussing the building with GOLEM can share the existing plan and one specific change they expect to fund. For the second classroom, ask the operator to mark the hours when the adjoining reading room must stay open. Draw the new wall and price relocating the duct access panel with the initial work. Beside that cost, show whether the contractor would need to close the reading room to move the panel later. The owner can approve the relocation now or reserve a closure in the future works schedule.