A museum can open a second public entrance when it makes an important route shorter or clearer and the museum can staff it. Start with where people already approach and what they come to do. If one street leads directly to public transport and another serves visitors coming from a courtyard, plot both streams on the plan. Give each open entrance clear information about what is open and how to reach it.
Once both doors are open, the routes need a shared reference inside the building. The transformation of Tate Modern by Herzog & de Meuron uses the scale and level changes of its former power station, with the Turbine Hall as a shared point of orientation. A smaller institution can test the same idea of recognisable common ground. Visitors arriving by separate doors should still be able to find the same place and use the names staff use. Herzog & de Meuron, Tate Modern Michael J. O’Neill, Effects of Signage and Floor Plan Configuration on Wayfinding Accuracy (1991)
For an ordinary day, ask the duty manager how many points of arrival can be attended when one person leaves their post. Compare this with an event day. If a second door only opens when there is a second team, display that arrangement on the visit page and at both doors.
The Prado visitor plan shows how a single source of information can carry entrances, vertical routes and a group meeting point together. A venue choosing how many entrances to run can prepare one map showing all the identifiable doors and another showing the doors that are actually staffed at different times. A party arriving early should be able to see which door they can use and where they can wait, including when one set of exhibition rooms closes. The next plan can show the part of the building that can open after the rest closes. Museo Nacional del Prado, plano de visita