A hotel’s late-night bar plan can show how people reach the bar, toilets, and exit and where sound from those routes could reach guest rooms. Let a person returning to their room pass the bar without walking through its queue. Give the night team a way to close the public part of the floor while staff finish clearing inside.
Draw the room above the sound source
The WHO’s Environmental Noise Guidelines for the European Region discuss the links between specified environmental noise sources and adverse effects, including sleep disturbance. They have a different purpose from a project specification for music in a hotel bar. Commission an acoustic brief that identifies the room above the bar, the nearest guest-room doors, and the path through ventilation and the structure. Agree what to measure in those rooms with the systems running and people leaving the bar. WHO Regional Office for Europe, Environmental Noise Guidelines for the European Region, 2018
Laurel Smith and Dan Griffin reported an Auckland hotel project with an isolated ceiling below a slab shared with some suites. During their test, receiving rooms showed an increase at low frequencies even though the A-weighted levels did not increase. Complaints persisted in the closest suites. Commission measurements in the rooms most exposed to the floor and structure, and agree how the operator will allocate rooms if particular nights produce disturbing sound. Laurel Smith and Dan Griffin, Disco Dreaming: Sound Insulation Between Bar and Hotel, 2005
Draw the last fifteen minutes of the shift
Basingstoke and Deane’s local licensing guidance treats doors, windows, vents, plant, and customers leaving as different routes for noise. The exact licensing conditions belong to the hotel’s location. Draw the bar with the street door open for a departing group and a hotel guest at the room entrance. If the doors are too close, changing the public exit path may do more than increasing the thickness of an internal partition. Basingstoke and Deane Borough Council, Noise from Licensed Premises
The Ned London lists live music in the lobby’s Nickel Stage and other venues on separate schedules, including late-night options away from the lobby. It gives an owner a reason to choose which bar, if any, remains open in the same space as people arriving for rooms. Where the layout offers a closing line, test access to toilets and departure without leaving the entire ground floor open. At the Berners Hotel in London, the acoustic consultant also records surveying inherited construction. A refurbishment brief can use that survey to decide which uses can occupy the room above or below the bar before the work is priced. The Ned London, late-night venues and live music Mr & Mrs Smith, The Ned City of London hotel review SRL Technical Services, Berners Hotel, London acoustic review
A hotel can assign opening conditions to each venue. During a live performance, decide which doors stay closed, where staff check tickets or reservations, and who monitors sound in the rooms likely to receive it. At last call the issue shifts to the path between the bar and the street. Position coat retrieval and transportation waiting so people can stand inside while the exit closes. Walk that plan with the person who will supervise the venue and the person covering the night desk. The operational approval should identify a manager able to act when a room above the bar is sold and a guest reports a problem.
The operator needs to know who will check the external doors and guest routes at last call. Include sound checks with the music off and patrons leaving, and with mechanical equipment running after everyone has gone. Observe where guests wait for a taxi, as well as whether the sound gets to a bedroom by way of its window. Those are conditions the overnight manager can check again after opening.
GOLEM’s account of DIVE describes a booth that can change height and be used for live performance. Wallpaper* attributes the acoustic threshold device to Basil Martion. For a hotel with a late bar, those records suggest two separate scope items. The operator can draw where the performer and equipment go and give the acoustic consultant the occupied rooms, sound sources and late-night operating conditions to test. For a listening programme, the same brief can test where music and conversation can share a room. Daven Wu, DIVE in Marylebone, Wallpaper*