A tenant buying a fit-out needs to know what the landlord will accept when the lease ends. A survey can record the original finishes, fixings, and services, and a second drawing can show what the tenant adds. Both parties can approve a handback drawing alongside the lease that marks what will stay, what will come out, and what the tenant will restore.
Draw the floor and wall after the counter comes out
A counter may need a fixing at the wall, a connection to power, and a way to level its base on a finished floor. Work through those details at one end. A fixing through existing tile leaves a different repair from one into a replaceable lining. Show what happens at the substrate, who approves the patch, and where the cables end once the counter is removed. Photograph the wall before it is covered. Give the photograph and the drawing the same location reference so the people inspecting the room at handback can find it.
The Royal Institution of Chartered Surveyors’ leasing code for England and Wales addresses alteration consent, obligations already stated in heads of terms, and the conditions in which a landlord may seek removal. The Better Buildings Partnership’s guidance asks asset managers to understand how removals would work in practice and to show the scope on existing and proposed drawings. Put a question beside every uncertain item while the lease team is still able to settle it. If a ceiling grid can remain but a track has to come out, get the agreed repair to the grid recorded with the alteration. RICS, Code for Leasing Business Premises, England and Wales, 2020, sections 8.2 to 8.6 Better Buildings Partnership, Alterations and Dilapidations, guidance note 10.2
Give each partition a place in the handback plan
In a fit-out for Patron Capital in London, Ambit’s demolition drawing distinguished glazed elements that would stay, move, or be removed. According to the Alliance for Sustainable Building Products, seven glazed doors were repositioned within the floor and three stayed in place. Some frames needed more members and new gaskets to take a different number of panels. Tracking a panel by type and location lets a subsequent team check its fit. For a new tenancy, put a retained door on the landlord’s plan and a movable door on the tenant’s removal schedule. Record which frame, seals, and hardware are needed if it goes elsewhere. Alliance for Sustainable Building Products, Ambit Moat and Patron Capital glazing reuse
For a Toulouse office renovation, AG Concept reports that it repositioned existing solid partitions and reused the aluminum framing, tracks, and cover strips when changing partially glazed partitions to full-height glazing. A partition in good condition may still need new material to fit the next room. Have the installer identify the length of profile, the sheet or glass size, and the parts that can come out intact. The UK Green Building Council recommends reversible connections such as screws and bolts. In a narrow return at the end of a run, check whether the screw can still be reached after the last adjacent panel is in place. A reversible fixing deserves a removal sequence in the shop drawing. AG Concept, Toulouse office partition reuse, September 2024 UK Green Building Council, Design for Deconstruction, reversible connections
Put the service condition in the tender
In CIBSE Journal, building services engineer Marc Hill recommends gathering record drawings, maintenance manuals, and commissioning documents before the lease. Ask the landlord’s facilities team to identify the system settings that need to be restored after a tenant removes a control or piece of equipment. Put the original connection on a drawing and agree an acceptance check for the room once the equipment comes out. Someone taking away a counter should be able to see where a cable is isolated and which remaining outlets serve the original room. The record of that connection belongs with the installation drawings. Marc Hill, CIBSE Journal, building services and dilapidations, 2018
Test the handback in two steps. In a proposed last-week inspection, the tenant and building manager check the original records while the counter and its control are still in use. After removal, the building manager witnesses the operation of the remaining service and the landlord compares the patched surface with the agreed sample. Put both visits in the removal scope. If the tenant will make the final repair after moving out, record who has access and whether any neighboring unit will be affected.
The initial estimate can cover installation and the later cost of removing the fit-out and making good. For that counter, have the installer mock up a removable end panel and show how a worker reaches the first fixing. Ask for an allowance to repair the wall and restore the electrical connection. The landlord and tenant can sign off on the retained wall, the removable assembly, and the finish they expect to see when it comes out.