GOLEMArchitecture·Art·Design

09.e.1How can you specify furniture modules so parts can be replaced, reused or added later?

A venue that wants to keep furniture in use during repairs needs to know which parts a fitter can replace on their own and how to get them out of the room. Each replaceable assembly needs a drawing reference and an order code. The supplier can say what the venue can stock now and order later, and price a first repair separately from a future addition.

Draw the first repair

A damaged worktop in a run of six can show what a repair would mean for the rest of the furniture. On the exploded drawing, mark the top, supporting rail, screws, and threaded inserts. Show which side the fitter approaches and where the used top can rest while the new one comes in. A loose top may fit through the door, while the frame and adjacent work surfaces need to stay in place. Ask the supplier to demonstrate removal with both neighboring modules installed. See whether the same insert can be used again and who can replace it if its threads are damaged. A detail that requires a dealer's jig has a different service plan from one the facilities team can repair between bookings.

The European Commission's 2017 voluntary green public procurement criteria for furniture ask for instructions that permit non-destructive disassembly. The core and comprehensive criteria call for availability of spare parts or components that perform the same function for three and five years respectively from delivery. The City of Helsinki's 2024 office and public furniture tender also asked for obtainable fasteners and gave replaceable floor protectors as an example. List the hardware in the order rather than leaving the fitter to find it. Ask bidders to identify which replacement costs are covered, which parts can ship independently, and where the published instructions will be kept. European Commission, EU Green Public Procurement criteria for Furniture, TS6 to TS10 City of Helsinki furniture tender, European Commission Green Forum case

For AMOREBA, Ariel André and GOLEM describe a fabrication method that leaves the constituent upholstery materials unglued. Record how fabric and filling come apart when asking a maker to quote for reupholstery. Then ask separately how the upholsterer would get to the damaged area on the installed piece. Draw the first accessible seam and identify what must come off to reach it. Price that operation for one worn area before deciding how much replacement fabric to keep.

Decide what to stock and what to order

A warranty period tells the buyer how long their protection lasts. It leaves open when a part will arrive. Separate stocked parts from made-to-order assemblies and establish the minimum quantity, typical quoted lead time, and point of contact for each. Ask whether the supplier would notify the owner when a connector goes out of production. In April 2026, Japanese office furniture maker Okamura announced that it was ending supply of certain parts for discontinued products and published repair availability by series. Pick the pieces whose loss would leave the most furniture out of service. Count low-cost fittings as well as visible parts. A missing hinge pin can take a cabinet out of use as surely as a damaged door. Okamura, notice about repair for discontinued office products, Japanese

The 606 Universal Shelving System has a separate schedule for the shelves, cabinets, desks, and tables that attach to its structure. Vitsœ also says it can supply pins and fixings to existing customers within the terms described in its FAQ. The components list gives the owner different orders to place. An early order might cover a few pinned shelves and one cabinet. A later order can add more shelves while the track stays in use. Carry that distinction into the furniture schedule. Identify the supporting pieces that make the system usable and price a reserve of the small, specific fittings that can take an entire bay out of use. Vitsœ, 606 component schedule Vitsœ, spares and inherited systems FAQ

For a client who needs a finish match, ask for one sample from the first delivery and agree where a visible difference is acceptable. Put the replacement surface next to an older one under the room's normal light. The buyer may accept a different shade on the underside of a cabinet while reserving the same finish for an entire visible run. Record that allowance in the order before the shop prices an exact match.

Give the used parts a place in the next plan

When Webb Yates Engineers moved offices, joiner Simon Elliston credited the cam dowels used in much of the old furniture with making deconstruction and remodeling easier. The project paired the existing pieces with refabricated parts. At SUPERZOOM in Paris, Ariel André and GOLEM made a pink table that could leave the gallery to accompany the art to fairs. Those examples put useful work on the furniture drawings. Decide which pieces should remain intact during a move, which can travel independently, and where the owner will keep the fittings that allow them to be used again. Webb Yates Engineers, London office reuse

Facilities staff can watch the first worktop repair before the venue accepts the order. Have the fitter identify what came out intact and how it would be labeled for storage. Then take the drawing for the seventh worktop in the run, and ask the supplier to point to the rail and fittings it would use. The owner can retain a useful spare and approve a separately priced scope for growth.

A schedule of removable parts can begin with what facilities staff expect to replace most often. The Gallery Climate Coalition’s display guidance raises reuse early in production. GOLEM’s record of the GROS BEAD frame and secondary assembly gives a built detail to discuss with a maker. In a modular furniture order, the maker can identify the fixture, the wear part and the tools needed to reach it, then show which of those interfaces is expected to stay consistent across later production batches. The first mock-up can also show how a worn furniture component would be repaired on site. Gallery Climate Coalition, Exhibition-making and display