09.b.4How do you keep lighting, ventilation, and controls working when a room is divided?

When an operable wall closes, each occupied half needs usable lights, ventilation, and local controls. A ceiling plan with the line of the wall can show what people can adjust in each half and what changes when the wall opens. The controls schedule should also say what the system does if one side is empty.

Put supply and return on the same drawing

Give the mechanical engineer the approved occupancy for each arrangement. ASHRAE’s 2025 Handbook describes a ventilation-rate procedure that combines per-person and floor-area rates and accounts for distribution and systems serving multiple spaces. The relevant VA design manual room criteria call for individual temperature control on both sides of a folding partition, return grilles on both sides, and a supply and return layout that works in both positions. Ask the engineer to apply the requirements that govern the actual building. Use the two references to ask what each side receives and where its air returns, especially when the larger half faces the sun and the smaller half holds more people. ASHRAE Handbook, Fundamentals, 2025, chapter 16, section 8 US Department of Veterans Affairs, HVAC Design Manual, Folding Partitions room criteria

As a design exercise, place a presentation in one half and a workshop in the other. Mark the seats, the thermostat or sensor and the supply and return points. Trace each air path with the wall closed. If the design depends on air crossing the room boundary, show that path to the acoustician as well as the mechanical engineer. Confirm that the technician who balances the system can reach the relevant equipment after the wall and its stack are installed. Check the air outlets again on a ceiling plan with the wall open and the furniture arranged for a single booking. An outlet over an unoccupied aisle in one arrangement can be directly above a seat in the other.

Decide who controls which lights and screens

Plan one lighting scene for each task. For a presentation, draw the dimmed screen area and the light still needed at the audience seats. In the workshop, put the full working scene at the actual tables. The CONVIA case study of the US Green Building Council headquarters describes controllers that can combine or divide lighting and occupancy sensors according to the state of a partition. Cooper Lighting Solutions documents how an infrared sensor can detect a partition’s position, and shows manual partition control as another option. A signal from the wall and a signal that people have left are two different inputs. Give each a row in the controls schedule and state which lights and scenes each input affects. CONVIA, USGBC headquarters case study, Lighting Control Partitioning Cooper Lighting Solutions, Greengate partition controller application note

At Ty William Morgan, the UK government hub in Cardiff, Paul Milligan describes a six-way divisible meeting room. With partitions shut, the network sends an input at a table to the screens serving its own section. Connected sections can share inputs when open. The touch panels have a mode for people giving their own presentations and another for technician setup. On a smaller project, give an operator an equally clear way to tell which room a button affects. Write down who can change the combined-room setting and where they stand to do it, before the wall hides a panel behind another booking. Paul Milligan, Inavate, flexible AV at Ty William Morgan

List the local and combined settings that staff actually need. For two bookings, the instructor at the interior tables may need to turn on the workshop lights while the other instructor is still using a presentation scene. For one booking, the host may want one button for the whole room. Show which local adjustment the combined scene retains so a request from one side does not silently undo the other side’s settings.

Test the transition with one room occupied

The Whole Building Design Guide treats the controls sequence as a design document and the functional test record as evidence of what happened. Start the commissioning test with both halves in use, then have one group leave. Let the specified sensors time out while the other group continues its activity. Observe which lights turn off, which controls respond, and whether the occupied side retains the ventilation and temperature response specified by the engineer. Then open the wall and select the combined scene from the operator’s usual position. Whole Building Design Guide, Commissioning Documents: Process, Contents, and Acceptance

Staff need to know what they can still operate if the system stops receiving the partition position signal. Have the controls contractor demonstrate the approved local fallback and identify the person who can restore automatic operation. Record the visible mode, control responses and plant behavior alongside the planned ones. The facilities lead can use that record to decide whether both halves are ready for separate bookings.

The Diriyah project description identifies wet and dry working areas in the printroom. GOLEM describes their partial separation by a PVC curtain and a separate darkroom. These are different kinds of boundaries. A client can brief one on where work is handled and the other on what conditions have to be maintained for a particular process. The drawings can identify what sound, light or ventilation requirements the operator expects each boundary to meet. The actual working conditions can be specified in the ceramics or printmaking workshop brief. ArchDaily, Diriyah Biennale Foundation Public Programs Building