A column grid tells the design team how far apart the column centerlines are. Someone crossing a room or pulling out a chair uses the clear space beside the columns. A feasibility plan needs both dimensions, along with the depth from the facade to the core and the position of usable windows. The team can then test room divisions, furniture, and occupied routes on copies of the survey.
Measure from the window to where the room stops
On a deep floor, show the proposed occupied rooms as well as the uses that can sit behind them. A residential test fit, for example, could place living rooms along the facade and bring storage or building services closer to the core. Put the window head, beam, and ceiling in a section through the deepest part of a living room. Mark where a person will sit or work. The beam or a suspended ceiling can limit the height available at that point. A neighboring building or a deep reveal can change the light that reaches it. Give the daylight specialist the proposed room section and surrounding obstructions with the plan.
A Brookings-led study shows how much the answer can change between floors in the same building. Its drawings and analysis of the Railway Exchange Building in St. Louis identify substantial deep floor area on levels 2 through 10. The team suggested self-storage as a possible additional use. On levels 11 through 16 an existing courtyard reduced the depth, and the study identified a corridor with some units facing inward as a feasible option. The authors were testing conversion possibilities. Use the comparison to decide where to take a second measured section, especially above a setback or the level where a courtyard begins. Brookings Institution, HR&A Advisors, Gensler, and Eckholm Studios, St. Louis office-to-residential conversion study, 2025
Put the room division where it can meet the facade
Trace a proposed room division past each column and to the window. When it lands on glass, move the line to the nearest mullion and check what happens to usable width on both sides. Put a bed and its approach on one side and a table with a pulled-out chair on the other. A column beside the wall might leave a recess that counts toward floor area yet offers little room to pass. Cost a new partition-to-window detail after checking whether one room could use the displaced strip of floor better. Record the effective width from the finished face of the column, including any encasement that stays.
In São Paulo, METRO Arquitetos kept the perforated cobogó elements of Oswaldo Bratke’s Edifício Renata and set new window frames behind them. The space between the two lines became a balcony-like area for residents. Read the architect’s description and the existing-versus-proposed diagrams together. A retained facade can leave room for a new inner line, with consequences for where the usable room stops and how it opens to the outside. Draw that line before counting it as floor area that can take a bed or table. METRO Arquitetos, Edifício Renata project record, 2024 ArchDaily em Português, Edifício Renata and project drawings, 2024
Draw the floor area that a new opening would remove
James S. Russell’s account of Chicago’s Tribune Tower describes a conversion with different problems at its base and in its upper tower. Solomon Cordwell Buenz cut an 80-foot-wide courtyard into the deep base. The new wings had depths that could take apartment layouts. The cut also took away lateral support and the project stiffened steel column-and-beam connections. At the former postal complex on rue Cler in Paris, the Pavillon de l’Arsenal documents a depth range of 16 to 26 meters before conversion and 6 to 21 meters after it. B&B Architectes report removing part of the center of the block and adding volume at the street and passage. Those two cases give a buyer reasons to compare the area lost at a new court with the layouts it makes feasible. The proposed court and the altered structural frame belong in the same cost estimate. James S. Russell, Architectural Record, Office Conversions Pavillon de l’Arsenal, B&B Architectes, rue Cler conversion dossier, 2015
The decision can come down to a single bay. In trial conversions from offices to housing in Tokyo, Kouichi Sato, Shuichi Matsumura, and Ruiko Nishi report 15 instances where a column projected into a proposed bathroom, restricting the use of standard prefabricated bath units. Give the owner two plans, one that fits the measured building and one that depends on alterations. Ask the surveyor to verify the column face, mullion, and clear ceiling height in the bay that changes between them. Price the opening or special assembly that the second drawing needs before giving the prospective floor area a value. Sato, Matsumura, and Nishi, Architectural Institute of Japan, office-to-housing trial layouts, 2005