GOLEMArchitecture·Art·Design

09.e.3How do you design a new furniture layout around salvaged modules that vary in size and condition?

A venue working with salvaged cabinets or benches needs a measured inventory before it can settle the layout. The inventory can show the condition of each piece where it meets the next, which positions it can fill, and how many complete runs the stock can make. Pieces with few substitutes can then go where their particular features are needed. A cabinet that stands alone may need a finished side, while a unit in the middle may depend on its neighbor for support or for a continuous edge.

Count the combinations the stock can make

The European FCRBE reuse inventory guide lists dimensions, quantity, and condition among the information needed to identify an available lot. Its worked examples distinguish left-opening and right-opening doors as the inventory gets more precise. Use the same level of detail for furniture. Give left and right ends separate lines when only one face can remain visible. Measure the finished depth, the locating points that make pieces join, and the height of the top once the piece is leveled. A catalog dimension can identify the furniture family. The survey dimensions decide whether three particular pieces can form a continuous counter. FCRBE, A Guide to Identifying Building Products with Reuse Potential

In its Italian sustainability report, USM describes how elements from a customer's existing Haller furniture were collected, tested, cleaned, and sorted for four relocations in Germany. This was a known product system. Keep the same sequence for a mixed lot, and allow more time to learn what can actually be combined. Put the hardware beside the furniture during the survey. Photograph a worn hole with its fitting and compare it with one in sound condition. Identify any connection the installer needs to inspect before accepting the unit. Keep those pieces on a separate line in the quantity schedule so an apparently available stock count stays distinct from the number usable on opening day. USM, Sustainability Report 2023 to 2024, Italian edition, p. 18

Put each exception somewhere it can work

For the Webb Yates Engineers office, architect Sam Turner modeled the existing furniture piece by piece. The project account compares what the practice had with what was subsequently remade. Draw your own receiving room with the surveyed dimensions, including the spaces needed to open a door and install or replace a panel. Put the most compatible frames in the longest run. A shallower unit may work at its end, where a separate top can finish it and there is room to reach the fixing. Check the joint with the actual pieces before cutting the top. A filler drawn against a wall absorbs a different kind of variation from an adapter that connects furniture. Webb Yates Engineers, Shaping Our New Office Through Reuse

A hypothetical office has six matching intermediate cabinets, two left ends, one right end, and three freestanding cabinets of different heights. The stock can make one finished continuous run with both ends. Use a freestanding cabinet in the second room where a change in height is acceptable. If the single right end fails inspection, price a new end with the exact interface or shorten the run and make the new last unit a stand-alone assembly. Give each version a schedule showing which pieces go into it. The operator can compare how much useful storage each version provides before deciding which joint to commission.

Compare the finish of the pieces after cleaning one sample, under the light planned for the receiving room. A worn side panel may be acceptable between cabinets and difficult to replace once it forms the exposed end of a public desk. Add the intended orientation to the tag. If a workable sequence needs two nearly identical pieces in different places, put the same identifiers on the packing list and the installation drawing.

Keep a place for the pieces that leave the plan

White Arkitekter's London office fit-out included second-hand furniture and an exchange of surplus under-desk caddies with other office managers. Published accounts of PLP Architecture's move to the White Chapel Building also distinguish furniture and materials reused on site from those donated, resold, or recycled. Put the destinations of surplus items in the schedule alongside pieces assigned to the plan. Keep likely substitutes available until the first installation has been checked. Record the date at which the operator can release any unassigned stock, so a piece needed to make a future repair stays available through the move. Laura Davies, Architecture Today, White Arkitekter's London Office Architecture Today, PLP Studio Ellie Stathaki, Wallpaper*, PLP Architecture's London Studio

Before delivery, ask the reuse contractor to lay out the tagged pieces for one complete run with its end units and hardware. Compare the assembly with the room drawing, including the position of the door and the usable depth of the top. If the dry fit changes which piece can go at the end, revise the plan and inventory together. Ask the installer and operator to approve that one run before releasing the rest of the stock.