GOLEMArchitecture·Art·Design

09.b.1How do you plan movable partitions, storage and building services so one room can support different activities?

The operator of a divisible room can start by naming two activities that should be able to run at the same time. Plans of the open and divided room at the same scale can then show what each activity needs for access, exits, storage, and services, with people and equipment in place. They also need to show where the partition panels stack and where any surplus furniture goes.

Choose what the wall has to separate

At the Diriyah Biennale Foundation’s Public Programs Building in Saudi Arabia, Ariel André and GOLEM gave the print room wet and dry work areas that a PVC curtain can partly separate. Photo development has a dedicated darkroom. Both decisions are visible in the same program. The curtain gives people a way to divide part of a working room. The darkroom has a separate enclosure. In a new workshop, lay out the activities and their equipment before describing the type of partition. A demonstration that people should be able to see from the next area has a different brief from an independent session with its own entry and equipment.

The City of Madrid’s operator sheet for the San Fermín public library records a 127.45-square-meter multipurpose room, a movable partition, a projector, and four electrical and four data outlets. It lists 64 audience chairs and gives a capacity of 64 for the room as listed. The photographs show the same partition collected and deployed. An inventory like this is a starting point for the drawings. Put each outlet on the divided plan and count the chairs that can be used in each half after the exits and furniture clearances are drawn. The library sheet gives a room total. Ask the design team to verify and record the capacity of the configurations you intend to book. City of Madrid, San Fermín Public Library multipurpose-room sheet, in Spanish

Give the furniture a destination

Sport England’s 2026 community hub guidance places stores where the hall and community rooms can reach them directly. It also sizes the door for the largest item of equipment that needs to pass. Put a loaded chair trolley on the plan, including its handle and the person pushing it. An aisle to an empty store may look generous. Test the turn again with the other furniture already inside and the store door held in its working position. If the only door onto the store is on the opposite side of the partition from the chairs that need it, either give the activity direct access to that store or assign its own equipment to a closer place. Sport England, Village and Community Hubs, July 2026, pp. 11 and 13

The French municipality of Navès published a plan for its divisible town hall room during construction. The legend identifies an equipment storage room and the movable wall’s parking position separately. Put both items on the furniture drawing, then add whatever can enter each one. The panel stack may leave a shallow recess that looks convenient for a trolley. Give the trolley another place if it would block the wall operator’s access. With the room open, verify the distance between the first chair and the usable face of each store door. Municipal bulletin of Navès, July 2021, labeled plan, in French

Check what each side has when the wall closes

At Concrete at Alserkal Avenue in Dubai, OMA used four rotating and sliding walls to arrange an exhibition and events space. Abitare describes the technical equipment integrated overhead, which freed the floors and walls for changes to the layout. Bring the same drawings together on a smaller commission. Put the closed partition on the ceiling plan, then locate the light, air, and equipment needed on either side. Put each instructor in their actual place, with a projection surface or workbench in front of them. Check what remains reachable from that position. Abitare, OMA’s multifunctional space in Dubai, June 2017 OMA, Concrete at Alserkal Avenue

People joining each session need a route the team can trace separately on the plan. If both halves are served by one foyer, give each door a legible name and enough room for someone to pause while others pass. Keep the route to an accessible restroom on the drawing when the wall is closed and when a line forms before the larger event.

For a briefing exercise, draw an evening lecture in the whole room and two classes in the divided room. Give one class a sink and the other a projection surface. Ask the hosts to mark where a late arrival sits and where the supplies needed during the class are kept. Then follow a full trolley out of storage while both classes are occupied. If reaching the sink or store requires opening the other class’s door, move the useful equipment or revise the division. Have the operator approve that pair of layouts before the architect issues the wall and ceiling locations for tender.