02.a.3Which accessibility requirements should be established before an architect begins concept design?

Before concept design begins, the client and design team need to establish which rules apply and what people must be able to do in the building. Give the architect an access brief tied to the site plan and room schedule. A requirement to reach every teaching room from the public entrance affects the position of those rooms and the vertical circulation. It belongs in the brief before the team compares layouts.

A short register from the local design team can set out the applicable requirements, consents and unresolved questions about scope. Record the jurisdiction, the type of work and the people responsible for checking each item. In England, volume 2 of Approved Document M gives guidance for building work in buildings other than dwellings. An existing venue may also need advice on obligations that arise from operating the service, and the project team should review emergency egress with its fire specialist. On an international commission, establish the applicable local requirements before using any foreign guidance as a design reference. Approved Document M, volume 2, England

Next, mark the decisions that need space. Draw the approach from the pavement or drop-off to the entrance. Locate a route to each public activity, the staff spaces in scope and the facilities serving them. Draw a section through each level change. A lift at the end of a corridor and a lift beside a shared stair may serve the same floors on the schedule, yet produce different travel distances and points of arrival. Resolve that relationship while the plan can still move.

Set project requirements around activities that a room name leaves open. A workshop brief can require a participant to reach a work surface, collect materials and wash tools, with a companion present if needed. The brief can also establish when spoken instructions need a written or visual equivalent. Ask staff and disabled participants to review the tasks. Record which details need a prototype and give the prototype a place in the programme and budget. Testing the design with disabled and neurodivergent visitors

At the Khoja Kalon Mosque complex, Ariel André - GOLEM built a ramp that linked several commissions along one path for the 2025 Bukhara Biennial. The published project account documents the route as a curatorial decision. For a new heritage commission, ask the architect to compare route sections and the artworks or rooms they connect while the programme is still being mapped. The project team can then assess access and conservation against the conditions of that site.

Release the concept brief with an owner and a decision date for every open item. If a survey must confirm a level or a public authority must agree a change to the pavement, write down which concept option depends on that answer. Include the access register and the route drawing in the first cost review so that space for access is accounted for alongside the public programme. Writing the inclusive design brief

Bring the route survey and any pending local decisions to a concept briefing with GOLEM. Ask for an option drawing that makes the effect of each unresolved requirement visible to the cost team.