The client needs to know who designs each part of the building, who reviews it for access and who handles local statutory submissions. Name the responsible people in the appointments and have all three work from the same drawings. Establish a short record of access decisions that survives revisions and changes of consultant. For each decision, show who proposes it, who checks it, and who can authorise the change on behalf of the client.
Start with one interface
The junction between the street and the entrance gives the team a concrete place to check who does what. Give the design architect responsibility for developing the approach and threshold with the rest of the plan. Ask the access consultant to test the proposal against the needs the client has identified. Ask the local architect to confirm who owns the pavement, which approvals may be required and which drawings the authority expects. Titles and statutory responsibilities vary by jurisdiction. Record what each appointment actually covers and who communicates with the relevant authority.
Circulate the same plan and section with the survey levels shown. Put a date and a drawing number on the comments, then have the architect responsible for that detail issue the revision. If adjusting the external level changes drainage or affects adjacent heritage fabric, bring the relevant specialist into that review. Historic England's guidance sets out how an access audit and an assessment of a historic building's significance can inform an access plan. It is a useful source for organising those discussions on projects in England. Historic England, Easy Access to Historic Buildings
Keep responsibility through construction
The curatorial architecture by Ariel André - GOLEM at the Khoja Kalon Mosque complex in Bukhara used a ramp to connect several artistic commissions along one path. On another project using a comparable intervention, the route drawing would give the local architect and access consultant a common place to discuss levels, existing fabric and the use of the exhibition. Agree who has responsibility for each detail where that route meets the historic building and how the team will review revisions proposed during installation.
The fees need to account for the people who will review the mock-up and visit before opening. For a proposed substitution during construction, require the team to record the effect on use alongside the effect on cost and programme. Give the operator the approved drawings and any continuing responsibilities for setting up or maintaining the route. The client should know who receives a report from a visitor and who can inspect the installation if the problem persists.
When appointing GOLEM, put the meetings with the local architect and access consultant in the scope. Name who owns the drawing for the entrance and who checks it again if the contractor changes the detail.