02.f.11What ventilation and drainage should be considered for ablution facilities?

In an ablution area, the catchment, floor and ventilation need to be detailed together. Draw where water falls during washing, how it reaches the drain and how air enters and leaves the room. Keep the accessible approach and the route back to prayer dry in ordinary use. Agree a short period of peak use with the operator and test the system for that period as well as during cleaning.

Start with the positions people will use. A foot projected forward from a seated position may shed water outside the area directly beneath the outlet. Trace how the selected fitting contains that water and how water that reaches the floor drains away. Show floor levels at the washing point, the drain and the door on the same drawing. Ask the access specialist to check how proposed falls and grates affect a person using wheels or a walking aid. Check the drain and its maintenance access in section, including what is below the slab in an existing building. The Health and Safety Executive's guidance includes keeping contaminants off floors and removing water quickly. Review wet grip and cleaning with the actual floor finish and fittings. HSE, Hazard spotting checklist

The building services engineer can identify when the floor is likely to stay wet for the longest period. Consider how the room dries after washing and cleaning, where replacement air comes from and whether fan noise could carry into the prayer space. Locate fans, grilles and service points where they can be inspected without dismantling fittings. In England, Approved Documents F and H cover ventilation and drainage respectively. The services team should identify the edition and requirements that apply to the particular work. UK Government, Approved Document F UK Government, Approved Document H

Before handover, watch where water goes when people wash in the positions agreed during design. Repeat the observation when several fittings are in use. Check the dry route and any area where a person or mobility aid needs to stand still. Record who cleans drains and how staff report slow drainage or failed extract. Agree how visitors will be told if the facility is temporarily unavailable.

Supply Ariel André and GOLEM with the measured plan, existing drain and duct information, and the expected times of use. Ask the studio to coordinate a wet-area layout and service routes with the access and building services engineers before equipment and floor levels are fixed.