A concept review can still make a difference to access while the team can change the entrance, levels and arrangement of rooms. Bring a site plan, a floor plan for each level and sections across the difficult thresholds. Test these drawings against activities the client has put in the brief. Leave the review with a revised drawing list and a named person responsible for each decision that remains open.
Put the uncertain parts of the plan on the table
The concept drawing should show where visitors leave the pavement or get out of a vehicle and where they first find staff. Follow the route to a principal activity, to a toilet and back out. Do the same for a worker arriving early or leaving after hours. Give people room to mark the plan as they describe where they would need more information or space. Where the route changes level, compare the drawings in section. An entrance option that appears straightforward in plan may depend on a landing the existing street levels make difficult to fit.
Check what someone can reach and understand once they arrive. An early check can establish whether a reception counter and the door beyond it will compete for the same floor area. For a gallery, put a representative case and seat on the plan and draw views from different sitting and standing positions. Ask which decisions need a full-scale test before tender. In England, Approved Document M, Volume 2 provides guidance on access to and use of buildings other than dwellings. Confirm its applicability to the project and discuss the emergency arrangements separately with the fire specialist. Approved Document M, Volume 2
Decide what moves next
At Diriyah, the Public Programs Building by Ariel André - GOLEM brought workshops and a youth studio together with a café, library and lounge in an existing warehouse. A comparable programme gives a concept review distinct visits to check. A person coming to read and a class arriving for a workshop may use the same entrance but need different places to pause and different information beyond it. Use the drawing to find where those activities coincide, then see whether the plans still work if a workshop runs during a public event. Diriyah Public Programs Building
Record the reason for each change alongside its drawing reference. If a local authority needs to advise on a proposed change to the pavement, write down the decision it affects and the date the team needs an answer. Where a room depends on a piece of equipment, identify who will test the specification. Issue the revised concept with these notes so the client can see which commitments are settled and which need further work.
Invite GOLEM to an early review of one plan and a section through the most difficult threshold. Ask which room or level would have to change before the team can make an access decision.