GOLEMArchitecture·Art·Design

02.a.6How can an architect reconcile public access, security and ticketing in a cultural building?

A venue can map how freely people are meant to move by identifying the rooms anyone can use, the rooms that need a ticket and the places that need screening. Draw the boundaries and every change of queue on the same plan. Give a person arriving for a café, workshop or exhibition a legible path to the appropriate destination. The layout should also show how people leave and how staff change the arrangements when part of the building closes.

The moment someone chooses a queue is where the different kinds of access first have to make sense. Put the distinction between ticket purchase, ticket scanning and free entry where a person can read it before joining a line. Give staff a view of the approach and a place to resolve an unfamiliar booking without stopping the main queue. Test a counter with room for a visitor using a mobility aid and check that a seated visitor can see the display, reach a payment terminal and speak with staff.

Where screening is required, draw the sequence for depositing, watching and retrieving a bag. Include the route used by someone who needs an alternative to the main device. In the United States, section 206.8 of the ADA Standards addresses security barriers on required accessible routes and means of egress. Where its exception permits a route beside certain screening equipment, visitors using that route must be able to keep equivalent visual contact with their belongings. Confirm the applicable rules and screening procedures with the local design and security teams. US Access Board, ADA Standards, section 206.8

An ordinary day and a launch with a separate guest list can be rehearsed on the same floor plan, with the ropes, scanners, tables and exits in place. The Smithsonian’s design standards discuss allocating queue space at museum screening stations. A venue can use its own plan to follow a walk-in visitor, someone crossing to a workshop and someone leaving at the busiest point. The fire and access specialists can then review where people cross the queue and where a person can sit and still tell when it is their turn to move. Smithsonian Design Standards, chapter 9

The Diriyah Biennale Foundation Public Programs Building by Ariel André - GOLEM groups workshops with a café, library and lounge. Its mix of destinations raises an early question for other cultural clients: which parts of the building should stay open while access to a particular event is controlled? Mark that line on an operating plan for the new venue and trace the route from the entrance to each destination on either side. Diriyah Biennale Foundation Public Programs Building

Furniture and equipment can affect access, so their layout belongs alongside the access and operating plans. Give the front-of-house team a marked layout for each event format, with space for overflow and a named person who can adjust the arrangement. A rehearsal with the venue’s own barriers and scanners gives the operator a chance to move equipment before the first crowded event. Finding and using the accessible entrance

For an early spatial study with GOLEM, bring the security brief, current foyer plan and busiest event layout. Ask to see the public boundary and the access routes on the same drawing before buying screening equipment.