Disabled users can shape the brief while the client is still defining it and the team can still consider several layouts. Give people specific decisions they can influence at each stage. Keep some participants involved as the drawings develop, and make room for others whose experience is relevant to a new question. Plan time and fees for that work in the appointment.
At the start, use an existing site or a typical visit to identify barriers and priorities. Ask participants which routes, activities or staff arrangements they would change. Turn their accounts into design questions the client can decide, with drawings or models people can use to compare the answers. At concept design, keep at least one option open where the discussion could affect the location of an entrance or the relationship between rooms. The RIBA's Inclusive Design Overlay identifies inclusive design activity across the Plan of Work. Use the stages as points at which to set decisions and responsibilities for a commission. RIBA, Inclusive Design Overlay to RIBA Plan of Work
During detailed design, choose a different kind of session. A full-size doorway or a section of a furnished room lets people try the physical action that was discussed on paper. Ask the participant to use a device, position or method they would normally choose. Agree how the findings will reach the person writing the specification or checking a shop drawing. For a public building, schedule a review during fit-out while signs, controls or furniture may still be adjusted, and a later visit once the building is operating. The UK Government Service Manual's advice on research sessions with disabled people gives practical prompts about planning around participants' access needs. Use that guidance for the sessions themselves and add building-specific methods where needed. UK Government Service Manual, Running research sessions with disabled people
Young V&A gives a built example of when a public test can happen. AOC Architecture describes working in the Open Studio before refurbishment, where the team tried proposals in public. The account concerns that project's co-creation process. In a different building, agree which disabled users have been involved at each stage and which practical issues still need a test with another group. AOC Architecture, Young V&A
When appointing Ariel André and GOLEM, share the project stages, the decisions still open and any existing links with disability-led groups. Ask for a schedule that connects each participation session to a design decision, with time in the appointment to show participants how the drawings changed.