GOLEMArchitecture·Art·Design

02.b.3What should an architect survey before adapting a historic entrance?

A survey of a doorway needs to include the approach, the opening and the first usable space on the other side. Take levels from the pavement or forecourt through the doorway to the lobby and record changes in both directions across the paving. Identify what is original, what has already been altered and where the evidence is uncertain. An access survey and an assessment of historic significance can use the same drawings while answering different questions.

Record what is there and how it is used

A measured plan and sections through the frame, sill and visitor’s path can show how the existing entrance is put together. Record the clear opening with the leaf at its usual position, the hardware someone reaches from outside and the free space each side. Observe where rainwater goes and whether mats, barriers or security furniture change the space measured on an empty plan. Draw the alternative route used today and observe when it is available. A doorway may work differently when a second leaf is bolted shut or when staff move screening equipment for an event.

Photographs and notes can help the conservation adviser distinguish building fabric from fittings. Identify examples of previous repairs and the material they affected. Check the status and extent of any protection with the competent local adviser. Historic England's guidance describes access audit and conservation assessment as complementary inputs to an access plan. That method helps the client see where a proposed improvement depends on further investigation or agreement about the significance of a particular feature. Historic England, Easy Access to Historic Buildings

Define the limits of the next study

At the Khoja Kalon Mosque complex in Bukhara, Ariel André - GOLEM made a continuous ramp to connect artistic commissions within a historic ensemble. An entrance survey for another heritage project can use that relationship to decide how far to measure. Continue the survey until the architect can explain which destinations the route will serve and where new work may meet existing fabric. Detail photographs of the sill are useful when they can be read alongside the levels through the courtyard and the first room.

The survey should show where the team could measure directly and where the construction is still hidden or uncertain. A drainage connection, the fixing of a frame or the construction beneath paving may need further investigation before options can be priced. Ask the survey team to state what it has assumed and identify where a proposed alteration depends on that assumption. Attach the survey to the brief for the entrance study so the client can compare options against the same record of levels, use and significance.

Ariel André’s designboom essay discusses GOLEM’s Broken Hearts Bazaar at the entrance to the Bukhara Biennial. It is a reason to ask for a second set of survey observations when a temporary programme occupies the approach. Mark what is installed for the event, where people wait and which surfaces the venue uses for the route that day. Keep those observations on a separate layer of the measured survey so another designer can reconstruct the ordinary plan. Ariel André, designboom guest essay

Give GOLEM the existing survey and the conservation adviser's record of significant fabric. Scope the route study to include the first room inside, the yard outside and any junctions that need further investigation.