GOLEMArchitecture·Art·Design

02.e.12How can furniture be rearranged for an exceptional event without blocking access?

An exceptional event needs its own furnished plan and an agreement on when staff can change the layout. Show the routes people will use to get in, leave and reach facilities while seats, tables and barriers are in place. Draw the space required by occupied chairs, queued visitors and their mobility devices. Include the path staff will use to remove furniture and the position where each item will be stored.

An event layout has to work with the existing building and the approvals that apply to it. Mark the doors, required clear routes and places kept free for evacuation or assistance. Coordinate those with the location of bars, ticket checks, caption screens and other event equipment. A sign can shift the head of a queue onto another route, while the cables to its screen can cross the approach to a wheelchair space. Show those elements on the same plan and have the event safety team check the occupied layout against the applicable requirements. The Health and Safety Executive's Great Britain event guidance treats circulation and sightlines as part of crowd control and advises monitoring crowd conditions inside the venue. HSE, Crowd controls inside the venue HSE, Monitor the crowd

At Bukhara, Ariel André - GOLEM used the Caravanserai's shared routes and places to pause as part of the curatorial architecture. Treat that relationship as a starting point for the event drawing. Where furniture normally gives someone a place to rest on a long route, the event layout should say where that place will be during the event. Record a usable alternative at the same part of the visit if a normal seat has to move. The Bukhara project account documents the installation. The temporary furniture and stewarding procedures here are proposals for the reader's venue.

A rehearsal before opening lets staff walk through the changeover without visitors present. Give a named person responsibility for checking the clear routes after delivery and again when the first queue forms. If staff can add seats during the event, give them a diagram of the positions already reviewed and agree the conditions under which they can use them. Run through the change from talk to reception as well, when visitors may be moving at the same time as staff collect chairs.

Send Ariel André and GOLEM the ordinary furniture plan and the brief for the busiest proposed event. Commission a changeover study with the event producer and safety team. Ask for a drawn setup and pack-down sequence that staff can follow on site.