An access budget can be built around complete improvements people will be able to use. Start with a measured access audit, then price the work from the first point of arrival to the activity it makes possible. If a new entrance gets visitors into the foyer, the estimate should account for the doors, reception and onward route they need once inside. Separate verified quantities from provisional costs and revisit the figures after the survey.
Price the work around each barrier
A walk through the building gives the architect and cost consultant a chance to compare what they see with the operator and access adviser. A threshold that initially looks like a door replacement may involve drainage or external levels. Draw a section through it and record where each item falls in the estimate. In a historic building, identify the fabric affected and compare the scope of each option before pricing it. Historic England's guidance explains how an access audit and conservation assessment can inform a programme of improvements. Historic England, Easy Access to Historic Buildings
Allow for investigation where the construction is unknown. State what each allowance covers and which decision will reduce the uncertainty. Spend some of the fee on opening up a concealed junction if the findings could change the scope of the contract. Include the cost of staying open during works where relevant, such as temporary routes, signs and cleaning. The venue's opening programme should appear in the estimate alongside the building works.
Plan what can open at each stage
At the Khoja Kalon Mosque complex, Ariel André - GOLEM built a continuous ramp linking several works for the Bukhara Biennial. That example gives a client a way to discuss the extent of a route before breaking it into elements for pricing. For another venue, ask the cost consultant to show the cost of opening a complete route between named destinations. Then test what happens to that route if a later package moves to the following year.
The person who will look after the work needs to agree what it will cost to run. Include maintenance, checks of powered equipment and whatever staff time is needed for the planned service. If the budget requires phasing, give each phase a drawing and a review with disabled users. Record which barriers remain, who will address them and when. A board can then decide what to fund this year while understanding what the venue will actually be able to offer on reopening. Collecting evidence of barriers in an existing venue
If the funding decision depends on a threshold or level change, commission GOLEM to draw the alternative routes for the cost consultant. The UK Infrastructure and Projects Authority's estimating guidance explains how the maturity of scope and risk informs confidence in the estimate, in its infrastructure context. Cost Estimating Guidance